What's New List Serve Post Display
Below is the List Serve Post you selected to display.
vapor -- Executive Orders VR-201-M and VR-202-M; Healy Phase II EVR System with and without In-Station Diagnostic System
Posted: 28 Jul 2010 11:36:54
Healy Phase II EVR System with In-Station Diagnostic Systems, Executive Order VR-202-M, has been revised to include and updated Veeder-Root ISD Software. Veeder-Root ISD Software version 1.03 enables single dispenser shutdown and reduces the frequency of nuisance alarms associated with vapor collection monitoring. The Executive Order, Installation Operation, and Maintenance Manual, and a list of revisions (Modification Highlights 0 have been uploaded to the vapor recovery webpage at www.arb.ca.gov/vapor/eo-evrphaseii.htm Non substantive changes (titles, headers and footers) were also made to Executive Order VR-201-M: Healy Phase II EVR System (not including ISD). The Executive Order, the Installation, Operation and Maintenance Manual and a list of versions (Modification Highlights) have been uploaded to the vapor recovery webpage at www.arb.ca.gov/vapor/eo-evrphaseii.htm