RULEMAKING TO CONSIDER AMENDMENTS TO VAPOR RECOVERY
SYSTEM CERTIFICATION AND TEST PROCEDURES FOR
GASOLINE MARKETING OPERATIONS AT SERVICE STATIONS
|
(December 12, 2002 Hearing)
|
|
FINAL APPROVAL / OAL ACTION |
The final rulemaking package was filed with OAL on October 21, 2003. The
final rulemaking package was approved by OAL and filed with the Secretary of State on December 5, 2003.
The regulation will become effective on January 4, 2004. |
|
ADOPTED REGULATIONS AND MATERIALS SUBMITTED TO OAL |
- Executive Order G-03-060
(PDF - 4K)
- Final Regulation Order
(PDF - 13K)
- D-200: Definitions
for Vapor Recovery Procedures (Amended) (PDF - 33K)
- CP-201: Certification
Procedure for Vapor Recovery Systems at Gasoline Dispensing Facilities (Amended) (PDF - 199K)
- TP-201.1: Volumetric
Efficiency of Phase I Vapor Recovery Systems (Amended) (PDF - 110K)
- TP-201.1: Volumetric
Efficiency of Phase I Vapor Recovery Systems (Repealed) (PDF - 73K)
- TP-201.1B: Static
Torque of Rotatable Phase I Adaptors (Amended) (PDF - 38K)
- TP-201.1C: Leak
Rate of Drop Tube / Drain Valve Assembly (Amended) (PDF - 99K)
- TP-201.1D: Leak
Rate of Drop Tube Overfill Prevention Devices and Spill Container Drain Valves (Amended) (PDF - 120K)
- TP-201.1E: Leak
Rate and Cracking Pressure of Pressure / Vacuum Vent Valves (For Adoption) (PDF - 37K)
- TP-201.2: Efficiency
and Emission Factor for Phase II Systems (Amended) (PDF - 19K)
- TP-201.2B: Flow
and Pressure Measurement of Vapor Recovery Equipment (Amended) (PDF - 306K)
- TP-201.2D: Post-Fueling
Drips From Nozzles (PDF
- 146K)
- TP-201.2F: Pressure
Related Fugitive Emissions (Amended)(PDF - 47K)
- TP-201.2F: Pressure-Related
Fugitive Emissions (Repealed) (PDF - 76K)
- TP-201.2G: Bend
Radius Determination for Underground Storage Tank Vapor Return Piping (For Adoption) (PDF - 63K)
- TP-201.2I: Test
Procedure for In-Station Diagnostic Systems (For Adoption) (PDF - 47K)
- TP-201.2J: Pressure
Drop Bench Testing of Vapor Recovery Components (For Adoption) (PDF - 60K)
- TP-201.7: Continuous
Pressure Monitoring (For Adoption) (PDF - 31K)
- Final Statement of Reasons (FSOR)
(PDF - 90K)
- Updated Informative Digest
(PDF - 12K)
- Notice of Decision and Response to Significant Environmental Issues (PDF
- 4K)
|
A business or person submitting a comment to a proposed regulation or
proposed amendment or repeal of a regulation or any person who specifically requests it has the right to request
a copy of the Final Statement of Reasons (FSOR). Upon its completion, the Final Statement of Reasons (FSOR)
will be available and copies may be requested from the agency contact persons, or may be obtained
in electronic form from this web page. |
|
EMERGENCY FILING (July 2, 2003) |
The emergency regulation was approved and filed with the
Secretary of State on July 3, 2003, and became effective the same day and will expire on November
1, 2003. |
|
EMERGENCY FILING (March 7, 2003) |
The emergency regulation was approved and filed with the
Secretary of State on March 13, 2003, and became effective the same day and will expire on July
12, 2003. |
|
|
HEARING ACTION AND SUPPLEMENTAL 15-DAY NOTICES |
Posted July 17, 2003: |
|
Amended Procedures |
- D-200: Definitions
for Vapor Recovery Procedures (PDF
- 39K)
- CP-201: Certification
Procedure for Vapor Recovery Systems at Gasoline Dispensing Facilities (PDF - 220K)
- TP-201.1E: Leak
Rate and Cracking Pressure of Pressure / Vacuum Relief Vent Valves (PDF - 58K)
- TP-201.2D: Post-Fueling
Drips From Nozzles (PDF
- 153K)
- TP-201.2F: Pressure
Related Fugitive Emissions (PDF - 71K)
|
Posted May 8, 2003: |
|
Amended Procedures |
- D-200: Definitions
for Vapor Recovery Procedures (PDF
- 36K)
- CP-201: Certification
Procedure for Vapor Recovery Systems at Gasoline Dispensing Facilities (PDF - 211K)
- TP-201.1C: Pressure
Integrity of Drop Tube / Drain Valve Assembly; Revised Title: Leak Rate of Drop Tube / Drain Valve Assembly
(PDF - 120K)
- TP-201.1D: Pressure
Integrity of Drop Tube Overfill Prevention Device; Revised Title: Leak Rate of Drop Tube Overfill Prevention Device
and Spill Container Drain Valves (PDF
- 128K)
- TP-201.2D: Post
Fueling Drips from Nozzle Spouts; Revised Title: Post Fueling Drips form Nozzles (PDF - 151K)
- TP-201.2F: Pressure
Related Fugitive Emissions (PDF
- 52K)
- TP-201.1E: Leak
Rate and Cracking Pressure of Pressure / Vacuum Relief Vent Valves (PDF - 38K)
|
|
PUBLIC HEARING NOTICE AND RELATED MATERIAL |
- Public Hearing Notice (HTML) or (PDF - 25K)
- Staff Report: Initial Statement of Reasons (ISOR) (PDF - 202K)
- ISOR App 1 - Proposed
Amendments to California Code of Regulations (Reg Order) (PDF - 15K)
- ISOR App. 2 - Proposed
Amendments of Vapor Recovery System Certification and Test Procedures
- D-200: Definitions
for Vapor Recovery Procedures (PDF
- 35K)
- CP-201: Certification
Procedure for Vapor Recovery Systems at Gasoline Dispensing Facilities (PDF - 195K)
- TP-201.1: Volumetric
Efficiency for Phase I Systems (BOTH PROPOSED AND REPEALED VERSIONS)
- TP-201.1B: Static
Torque of Rotatable Phase I Adaptors (PDF
- 40K)
- TP-201.1C: Leak
Rate of Drop Tube/Drain Valve Assembly (PDF
- 89K)
- TP-201.1D: Leak
Rate of Drop Tube Overfill Prevention Device (PDF
- 106K)
- TP-201.1E: Leak
Rate and Cracking Pressure of Pressure / Vacuum Relief Vent Valves (PDF - 37K)
- TP-201.2: Efficiency
and Emission Factor for Phase II Systems (PDF
- 21K)
- TP-201.2B: Flow
and Pressure Measurement of Vapor Recovery Equipment (PDF - 302K)
- TP-201.2D: Post
Fueling Drips from Nozzle Spouts (PDF
- 82K)
- TP-201.2F: Pressure
Related Fugitive Emissions (BOTH PROPOSED AND REPEALED VERSIONS)
- TP-201.2G: Bend
Radius Determination for Underground Storage Tank Vapor Return Piping (PDF - 64K)
- TP-201.2I: Test
Procedure for In-Station Diagnostic Systems (PDF
- 49K)
- TP-201.2J: Pressure
Drop Bench Testing of Vapor Recovery Components (PDF - 61K)
- TP-201.7: Continuous
Pressure Monitoring (PDF - 32K)
- ISOR App. 3 - Vapor
Recovery Health and Safety Code Statutes (PDF
- 28K)
- ISOR App. 4 - EVR
Technology Review Report
|
|
INFORMAL REGULATORY ACTIVITY |
|