Executive Order G-70-150-AD

This page last reviewed April 18, 2016


Executive Order G-70-150-AD

Modification of the Certification of the Gilbarco VaporVac Phase II Vapor Recovery System (Acrobat 818K)

The above document is also available below in its 16 subparts:


Legal Legal Language (Acrobat 78K)
Exhibit 1 Equipment List (Acrobat 31K)
Figure 1A OPW Model 11VAI-xx Nozzle (Acrobat 50K)
Figure 1B Husky Model V3-6201xxx Nozzle (Acrobat 26K)
Figure 1C Emco Wheaton Model A4500 Nozzle (Acrobat 59K)
Exhibit 2 Specifications for the VaporVac Bootless Nozzle System (Acrobat 25K)
Figure 2A-1 Typical Installation of the Gilbarco VaporVac Phase II Vapor Recovery System with Two-Point Phase I System (Acrobat 57K)
Figure 2A-2 Typical Installation of the Gilbarco VaporVac Phase II Vapor Recovery System with Two-Point Phase I System (Acrobat 47K)
Figure 2A-3 Typical Installation of the Gilbarco VaporVac Phase II Vapor Recovery System with Two-Point Phase I System (Acrobat 52K)
Figure 2A-4 Typical Installation of the Gilbarco VaporVac Phase II Vapor Recovery System with Two-Point Phase I System (Acrobat 52K)
Figure 2B-1 Component Parts of the VaporVac System (Acrobat 66K)
Figure 2B-2 VaporVac Dispenser Types (Acrobat 234K)
Exhibit 3 Static Pressure Integrity Test Underground Storage Tanks (Acrobat 132K)
Table 3-1 Pressure Decay Leak Rate Criteria (Acrobat 8K)
Form 3-1 Summary of Source Test Results (Acrobat 14K)
Exhibit 4 Ten Gallon Per Minute Requirement (Acrobat 8K)