Executive Order G-70-169-AA

This page last reviewed April 19, 2016


Executive Order G-70-169-AA

Modification to the Certification of the Franklin Electric Intellivac Phase II Vapor Recovery System (PDF Format 481K)

The above document is also available below in it's 15 subparts:


Exhibit 1 & Exhibit 2 Legal, Equipment List & Specifications (PDF Format 106K)
Figure 2A-1 Typical Installation of the Intellivac Phase II Vapor Recovery System with Two-Point Phase I System (PDF Format 46K)
Figure 2A-2 Typical Installation of the Intellivac Phase II Vapor Recovery System with Two-Point Phase I System (PDF Format 42K)
Figure 2A-3 Typical Installation of the Intellivac Phase II Vapor Recovery System with Two-Point Phase I System (PDF Format 46K)
Figure 2A-4 Installation of the Intellivac Phase II Vapor Recovery System with Two-Point Phase I System (PDF Format 46K)
Figure 2A-5 Typical Installation of the Intellivac Phase II Vapor Recovery System with Two-Point Phase I System (PDF Format 38K)
Figure 2B Intellivac Vapor Pump System (PDF Format 15K)
Figure 2C-1 OPW Model 11VAI Nozzle with Vapor Valve (PDF Format 13K)
Figure 2C-2 Husky Model V34 6250 Nozzle (PDF Format 12K)
Figure 2D Proper Installation of the A/L Adaptor (PDF Format 28K)
Figure 2E Instructions for use of the 6250 A/L Adaptor (PDF Format 12K)
Exhibit 3 Leak Decay Test (PDF Format 134K)
Table 3-1 Pressure Decay Leak Rate Table (PDF Format 7K)
Form 3-1 Summary of Source Test Results (PDF Format 12K)
Exhibit 4 Ten Gallon Per Minute Requirement (PDF Format 7K)